HOW THE MAXILODA WORKS > One Man, One Minute Assembly
|
|
One Man, One Minute Assembly
The key to quick turn around times is in the weight of the system which allows a “one man one minute” assembly operation. Because the heaviest section is only 8 kilos, assembling or de-assembling and stowing the system takes only one operator one minute to complete. Another key to the quick turn around time is the movement of the light trolley beams through a fully enclosed track. The system is both safe and secure from theft. Click Here to watch videos of the MaxiLoda System in action |